REQUIREMENTS FOR PERMANENT SERVICE CONNECTION

I - PANELCO I
Contact PANELCO I accredited electrician to:

1 Estimated cost of house wiring materials
2 Prepared electrical plan or sketch (indigenous materials) to be signed by a Professional Electrical Engineer.
3 Electric bill receipt of the nearest neighbor
4 Community tax certificate number
5 Contact number

II - LGU
1 Electrical permit
2 Certificate of Final Electrical Inspection (CFEI)
3 Certificate of Occupancy

III - MAGNA CARTA

A. FOR OWNERS:
1 Valid Identification
2 Proof of Ownership
3 Barangay Clearance or Certification showing proof of residency in the barangay
4 List of loads

B. FOR SUCCESSORS:
1 Valid Identification
2 Proof of Succession to the property
3 Barangay Clearance or Certification showing proof of residency in the barangay
4 List of loads

C. FOR AUTHORIZED REPRESENTATIVES OF OWNERS:
1 Valid Identification
2 Notarized authorization from the owner of the property
3 Barangay Clearance or Certification showing proof of residency in the barangay
4 List of load

REQUIRED FEES:

Item Quantity Cost / Unit Total Cost
KWH Meter MK-61 1 pc. 0.00 0.00
Hycrimp YHO-100 6 pcs. 38.16 228.96
Hycrimp YHO-150 2 pcs. 38.16 76.32
Screw Insulator, Wire Holder 1 pc. 39.70 39.70
Service Grip Dead End #6 2 pcs. 34.09 68.18
Meter Base Cl 100, 3/4 1 pc. 304.75 304.75
Meter Box, Universal 1 pc. 574.31 574.31
Meter Box, ( for MK-31) 687.70 0.00
Padlock Seal 1 pc. 25.71 25.71
Sub-total 1,317.93

Membership Fee 100.00
Notarial Fee 50.00
Processing Fee 20.00
ID Fee 100.00
Sub-total 270.00

Grand Total 1,587.93